Back to Global ProjectsOverseas Projects

Overseas Projects
Peru 2,400 t/h Underground Modular Heavy Apron Feeder
Bolted split-frame passes narrow mine shafts; segmented sprockets enable single-shift underground service.
- Location
- Peru · Underground Primary Crushing Vault
- Handled Material
- Copper-Gold Sulfide Ore
- Equipment Model
- BLACK-HDF 2000×9500
- Design Capacity
- 2,400 t/h
Site Operating Parameters
- Pan Width × Length
- 2,000 × 9,500 mm
- Inclination
- 18°
Split bolted frame modules descended through the service shaft and assembled underground within 72 hours.
